Customers
Education
Primary and Secondary schools in Suffolk, East Sussex, Croydon and Southampton are having their plant-rooms upgraded; packages include the Dynamic Burner Management Unit and ValveWrap.
Typical paybacks are between 12 and 24 months with funding often provided by the Local Authority Energy Finance (LAEF) package, allowing schools to pay for the improvements through savings in fuel costs.
Between two and eight boilers, one water heater and 40 unlagged fittings would typically be found in these types of premise.
Leisure Centres
Leisure Centres offer a challenge to those seeking energy savings because of the large fluctuating hot water requirement super-imposed onto the base heating and swimming pool load.
The Dynamic Burner Management unit is ideally suited to this difficult application as it responds continually to demand and can cope with the rapid changes in hot water requirements.
Two large boilers and 50 unlagged fittings will typically be found in this type of premise.
Nursing Homes
Comfortable temperatures for the elderly and a 24/7 operation result in high fuel bills and therefore Nursing and Care Homes are very suitable applications for a plant-room upgrade.
Two or three boilers with a water heater and 40 unlagged fittings would typically be found in this type of premise.
Public Services
Police stations and fire stations operate on a 24/7 basis and hence attract large fuel bills.
Several police forces have applied and received finance through the Local Authority Energy Finance (LAEF) scheme and, like schools, are able to pay for the improvements through savings in fuel costs.
Four boilers, a storage water heater and 30-40 unlagged fittings would typically be found in this type of premise.

Back to top